EcoTech Building Solutions

SWC Sundre WWTP construction site

Directions and location for the Soneera Water Canada wastewater treatment plant construction site, north of Sundre, Alberta.

Project
Soneera Water Canada - Sundre WWTP
Legal location
NW 10-33-5 W5M, Plan 8211143 Block 1
GPS
51.8170° N, 114.6300° W
Nearest major intersection
Hwy 27 and James River Road

Other SWC location

Soneera warehouse in Sundre →

Driving directions

Lagoon cells Hwy 27 (Cowboy Trail) Centre St N becomes James River Rd (Range Rd 53) approx. 3 km north Twp Rd 331A turn right (east) Start S Follow signage N
Schematic, not to scale. Use Open in Google Maps to navigate.
  1. 1From Cowboy Trail (Hwy 27) and Centre Street N, head north.
  2. 2Continue as Centre Street N becomes James River Road (Range Road 53).
  3. 3Drive north approximately 3 km.
  4. 4Turn right (east) onto Township Road 331A.
  5. 5Follow Township Road 331A toward the wastewater lagoon cells.
  6. 6Follow posted signage to the SWC construction entrance.

Delivery contacts

Call in this order

Call first Doug Strachan Site Super and Unloading · EcoTech Building Solutions 1.250.575.9375 Call Doug
Then Chad Dorsett Project Management · EcoTech Building Solutions 1.306.604.1717 Call Chad

Site access

  • Schedule visits in advance through EcoTech Building Solutions or Soneera Water Canada.
  • All vendors, trades, freight, and logistics personnel must sign in on arrival and sign out before leaving.
  • No unauthorized access.
  • Follow all posted signage, PPE requirements, and site-specific safety protocols.
  • Deliveries: contact Doug Strachan on arrival; do not unload until confirmed.

Emergency

Call 911 immediately, then contact Ron Miller (1.403.701.2571) to report the incident.